What must be planned for at-risk offset wells before fracking?
Category:
Hydraulic Fracturing
Research Basis
Archive Period
2012-2016
Records Reviewed
9
Primary Topics
Directive 083; at-risk offset well; well control plan; monitoring; adjusted maximum pressure
Current Reference
AER Directive 083; IRP 24; AER Directive 009; AER Directive 010
Common Question
What must be planned for at-risk offset wells before fracking?
Archive Findings
Directive 083 requires a documented control plan for each at-risk offset well.
The plan must cover detection, communication back to frac operations, adjusted maximum pressure, and how well control will be maintained.
.png)
Need help with an application?
Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays
587.880.2249
Engineering Insight
For any well marked monitor or shut-in, define who monitors it, what is measured, response thresholds, communications, and contingency actions before the frac starts.
Current Guidance
Current Directive 083 should be used for at-risk offset-well planning and hydraulic-fracturing communication-event requirements.
Related Regulatory Insights
Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.
Jan 1, 2022
Geothermal Resource Tenure and Directive 010 Updates
This issue covers proclamation of the Geothermal Resource Development Act, geothermal resource tenure, Directive 010, Mines and Minerals Act representative requirements, Manitoba well suspensions, and BC gas plant and parcel-map updates.