Archive Findings
The FAQ says a cement evaluation log could be run to help assess hydraulic isolation, but licensees are not required to run a CBL and a CBL is not conclusive evidence.
The AER said representative CBLs would be considered case by case.
.png)
Need help with an application?
Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays
587.880.2249
Engineering Insight
Use a CBL when it helps answer the actual integrity question. If relying on other evidence, document why it is technically adequate.
Current Guidance
Current Directive 083 should be checked with current cementing rules before deciding on logs. The file should support casing integrity and hydraulic isolation, not just contain a log.
Related Regulatory Insights
Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.
Jan 1, 2022
Geothermal Resource Tenure and Directive 010 Updates
This issue covers proclamation of the Geothermal Resource Development Act, geothermal resource tenure, Directive 010, Mines and Minerals Act representative requirements, Manitoba well suspensions, and BC gas plant and parcel-map updates.