Should an operator submit a disposal application before final perforations or stimulation work are complete?

Category:

Applications and Approvals

Research Basis

Archive Period

2019

Records Reviewed
6
Primary Topics
application timing; perforation interval; acidizing; notification; hydraulic isolation logs; amendments
Current Reference
AER Directive 051; AER Directive 065; AER Directive 056; AER Manual 012

Common Question

Should an operator submit a disposal application before final perforations or stimulation work are complete?

Archive Findings

The 2019 correspondence captures a common timing problem. The well initially did not take enough fluid, and the operator was considering additional perforations and acidizing while wanting to keep the application moving. The regulatory advice in the archive was practical: apply for the largest interval that could be defended and notified, because narrowing later is easier than expanding after approval. The correspondence also cautioned that applying for one interval while testing or planning a different or larger interval could look misleading and would weaken the evidence package.

Engineering Insight
Need help with an application?

Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays

587.880.2249

Before filing, reconcile four things: proposed perforated interval, notification interval, hydraulic-isolation logging interval, and the interval shown on the wellbore schematic. If the operator may add perforations, decide whether the application should cover the larger credible interval from the start. If post-approval changes are likely, identify what amendment may be needed and what evidence will be rerun. Do not rely on a log or notification program that covers less than the requested disposal interval.

Current Guidance

Current Directive 051 requires logs and the Well Summary/completion schematic to support the injection or disposal approval before operations begin. Current Directive 065 requires representative geological cross-sections, maps, fluid-interface interpretation, and confirmation of wells in the area of influence. Manual 012 and Directive 056 govern application procedures and participant involvement where applicable.

Related Regulatory Insights

Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.

Jun 1, 2026

Directive 051 Proposed Changes and Closure Management Updates

This newsletter summarizes proposed changes to Directive 051, updates to closure nomination and liability-management processes, and related AER and Saskatchewan regulatory items.

Nov 1, 2024

Directive 065, Subsurface Orders and Well File Updates

This issue includes well-file service information, Directive 040 testing reminders, Subsurface Order 2A, new Directive 065 material, Directive 083, Manual 028, OneStop updates, and MRF/geothermal items.

Apr 1, 2026

AER Industry Levy, Orphan Fund Levy and Directive 056 Updates

This issue covers AER industry levy and orphan fund levy updates, revisions to Directive 056 and Manual 012 for carbon dioxide and hydrogen pipelines, licence-transfer security-estimator changes, and related royalty-administration items. It is a strong compliance update for operators managing annual cost and licensing obligations.

Jul 15, 2024

Special Directive 065 Changes for Disposal, Storage and Carbon Sequestration

This special newsletter focuses on Directive 065 changes related to disposal, storage, induced seismicity, acid gas disposal, sequestration, monitoring, and risk-assessment expectations.

Feb 1, 2026

AERH2S Model and Site-Specific Risk Assessment Updates

This newsletter highlights the transition to AERH2S for Directive 056 applications, new site-specific risk assessment checklist expectations, and related licensing considerations. It should be used as a well-licensing and H2S resource for operators preparing applications that require release-rate or emergency-planning support.

Jan 1, 2025

Directive 056 and Liability Management Framework Updates

This issue covers liability-management directive updates, Directive 056, Directive 089, Directive 090, Manual 012 changes related to brine, geothermal, and mineral development, and BC disposal-dashboard information. It is a strong well-licensing and emerging-resource update for operators planning new applications.