Can a heavy oil analysis justify 25 m flare spacing instead of 50 m?

Category:

Facilities and Spacing

Research Basis

Archive Period

1999-2025

Records Reviewed
33
Primary Topics
equipment spacing; flare stack; crude bitumen; heavy oil; spacing waiver; wellhead distance
Current Reference
AER Directive 060; AER Directive 056; Production Operations application checklist

Common Question

Can a heavy oil analysis justify 25 m flare spacing instead of 50 m?

Archive Findings

Not by itself. Historical records indicate that a spacing waiver may be required if the 50 m wellhead-to-flare stack distance could not be met.

Although the oil analysis showed heavy oil, the well was not licensed as crude bitumen, so AER applied the 50 m requirement rather than the 25 m crude-bitumen spacing.

Engineering Insight
ChatGPT Image Jul 11, 2026, 04_05_45 PM (2).png
Need help with an application?

Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays

587.880.2249

Check the licence status before relying on fluid properties. If spacing cannot be met, submit a clear waiver package with plot plan, equipment list, fluids, vapour sources, affected requirement, and safety justification.

Current Guidance

Current Directive 060 contains flare/incineration/enclosed combustion performance and spacing requirements. Directive 056 and AER production-operations checklists support related facility or waiver submissions.

Related Regulatory Insights

Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.

Apr 1, 2026

AER Industry Levy, Orphan Fund Levy and Directive 056 Updates

This issue covers AER industry levy and orphan fund levy updates, revisions to Directive 056 and Manual 012 for carbon dioxide and hydrogen pipelines, licence-transfer security-estimator changes, and related royalty-administration items. It is a strong compliance update for operators managing annual cost and licensing obligations.

Jan 1, 2025

Directive 056 and Liability Management Framework Updates

This issue covers liability-management directive updates, Directive 056, Directive 089, Directive 090, Manual 012 changes related to brine, geothermal, and mineral development, and BC disposal-dashboard information. It is a strong well-licensing and emerging-resource update for operators planning new applications.

Feb 1, 2026

AERH2S Model and Site-Specific Risk Assessment Updates

This newsletter highlights the transition to AERH2S for Directive 056 applications, new site-specific risk assessment checklist expectations, and related licensing considerations. It should be used as a well-licensing and H2S resource for operators preparing applications that require release-rate or emergency-planning support.

Jun 1, 2024

Directive 056, H2S and Pipeline Application Updates

This issue summarizes Directive 056, Manual 012, H2S, Directive 059, EPEA pipeline application conditions, OneStop, Directive 011 liabilities, ST98, and facility life-cycle topics.

May 1, 2025

Benoit+ WellFile and Key 2025 Directive Updates

This issue introduces Benoit+ WellFile and summarizes regulatory updates involving Directive 040, Directive 060, Directive 039, Directive 020, pilot-technology guidance, shallow-rights reversion, Saskatchewan orphan matters, and BC EIMS items.

Mar 1, 2025

Facility Life-Cycle Status Validation and 2025 Levy Updates

This issue focuses on facility life-cycle status validation, OneStop land updates, 2025/26 levy information, Directive 060 matters, wildfire-related updates, and BC facility-streamlining changes.

bottom of page