Where should a slotted liner be reported in DDS?
Category:
Completion Reporting
Research Basis
Archive Period
2013-2018
Records Reviewed
5
Primary Topics
slotted liner; casing data; completion data; cementing code; DDS reporting
Current Reference
AER Directive 059; AER Manual 027
Common Question
Where should a slotted liner be reported in DDS?
Archive Findings
The Directive 059 FAQ says an uncemented slotted liner is recorded in the casing section and the completions section.
It describes the casing entry as a liner with the applicable cementing code, and the completion entry as a slotted liner interval.
Engineering Insight
.png)
Need help with an application?
Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays
587.880.2249
Report both the physical liner and the completion interval. Missing one side can leave the well record incomplete.
Current Guidance
Use current Directive 059 and Manual 027 for casing, liner, cementing, and completion data entry requirements.