top of page
From the Archive:

What is the GCI when the wellbore has an open hole completion?

Regulatory Intelligence 

Where should a slotted liner be reported in DDS?

Category:

Completion Reporting

Research Basis

Archive Period

2013-2018

Records Reviewed
5
Primary Topics
slotted liner; casing data; completion data; cementing code; DDS reporting
Current Reference
AER Directive 059; AER Manual 027

Common Question

Where should a slotted liner be reported in DDS?

Archive Findings

The Directive 059 FAQ says an uncemented slotted liner is recorded in the casing section and the completions section.

It describes the casing entry as a liner with the applicable cementing code, and the completion entry as a slotted liner interval.

Engineering Insight
ChatGPT Image Jul 11, 2026, 04_05_45 PM (2).png
Need help with an application?

Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays

587.880.2249

Report both the physical liner and the completion interval. Missing one side can leave the well record incomplete.

Current Guidance

Use current Directive 059 and Manual 027 for casing, liner, cementing, and completion data entry requirements.

Related Regulatory Insights

Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.

Jun 1, 2024

Directive 056, H2S and Pipeline Application Updates

This issue summarizes Directive 056, Manual 012, H2S, Directive 059, EPEA pipeline application conditions, OneStop, Directive 011 liabilities, ST98, and facility life-cycle topics.

Mar 1, 2018

Directive 060, OneStop Drilling Data and Subsurface Orders

This issue covers Directive 060, Directive 059 well drilling and completion data in OneStop, Saskatchewan acid gas disposal, geothermal and CO2 IRIS items, subsurface orders, and LMR/IWCP content.

bottom of page