top of page
From the Archive:

Where should a slotted liner be reported in DDS?

Regulatory Intelligence 

What is the GCI when the wellbore has an open hole completion?

Category:

Completion Reporting

Research Basis

Archive Period

2013-2018

Records Reviewed
5
Primary Topics
open-hole completion; gross completion interval; casing shoe; total depth; completion reporting
Current Reference
AER Directive 059; AER Manual 027

Common Question

What is the GCI when the wellbore has an open hole completion?

Archive Findings

The Directive 059 FAQ states that open-hole GCI is reported from the shoe of the last cemented casing to total depth.

That gives a practical rule for wells without perforations across a discrete cased-hole interval.

Engineering Insight
ChatGPT Image Jul 11, 2026, 04_05_45 PM (2).png
Need help with an application?

Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays

587.880.2249

For open-hole completions, identify the last cemented casing shoe before calculating or reporting the GCI. Do not default to surface-to-TD or licence depth.

Current Guidance

Use current Directive 059 and Manual 027 for open-hole completion and GCI reporting.

Related Regulatory Insights

Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.

Jun 1, 2024

Directive 056, H2S and Pipeline Application Updates

This issue summarizes Directive 056, Manual 012, H2S, Directive 059, EPEA pipeline application conditions, OneStop, Directive 011 liabilities, ST98, and facility life-cycle topics.

Mar 1, 2018

Directive 060, OneStop Drilling Data and Subsurface Orders

This issue covers Directive 060, Directive 059 well drilling and completion data in OneStop, Saskatchewan acid gas disposal, geothermal and CO2 IRIS items, subsurface orders, and LMR/IWCP content.

bottom of page