top of page
From the Archive:

Can an operator rely on a hydraulic-isolation log if the well was barely taking fluid during the logging run?

What should an engineer explain when using CBL/RBL evidence to support a disposal application?

Regulatory Intelligence 

When checking an existing casing string for injection or disposal conversion, which value belongs in the Directive 051 burst equation?

Category:

Well Integrity

Research Basis

Archive Period

1994-2019

Records Reviewed
6
Primary Topics
casing inspection logs; minimum yield strength; wall loss; conversion wells; MWHIP
Current Reference
AER Directive 051; AER Directive 065; AER Directive 010

Common Question

When checking an existing casing string for injection or disposal conversion, which value belongs in the Directive 051 burst equation?

Archive Findings

The 2019 application correspondence shows a practical error that engineers can easily make: using a published internal yield pressure value as if it were the specified minimum yield strength in the casing equation. The discussion corrected the approach by using the casing's minimum yield strength and then applying wall-loss reduction to calculate internal yield pressure. The same folder also contains the 1994 D051 workshop/guide language that anchors the issue: casing inspection logs must assess casing integrity on a joint-by-joint basis, and maximum burst resistance is based on least wall thickness and minimum yield strength. The archive consistently treats the check as a casing-integrity demonstration, not a simple table lookup.

ChatGPT Image Jul 11, 2026, 04_05_45 PM (2).png
Need help with an application?

Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays

587.880.2249

Engineering Insight

For conversions, verify the casing grade, outside diameter, nominal wall thickness, and maximum measured metal loss before calculating burst resistance. Do not mix three different concepts: specified minimum yield strength, calculated minimum internal yield pressure, and the proposed MWHIP. When wall loss is present, use the least remaining wall thickness or the maximum metal-loss penetration from the casing inspection log. Keep the calculation trail in the application file so the reviewer can see where every number came from. A strong submission should also explain whether the damaged joint is within the pressure-exposed interval, above the packer, or otherwise isolated from injection service.

Current Guidance

Current Directive 051 section 5.3.1 requires a full-length casing inspection log for any existing well proposed for conversion and requires maximum burst resistance, based on least wall thickness and minimum yield strength, to exceed 1.3 times the maximum allowable wellhead injection pressure. Current Directive 065 now carries the MWHIP framework for disposal applications, so the casing check and the MWHIP justification need to be internally consistent.

Related Regulatory Insights

Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.

Aug 31, 2026

Directive 051 Finalized, Closure Quota and 2027 Royalty Updates

This September update covers finalized Directive 051 disposal-well requirements, practical Directive 020 abandonment changes, the 2027 closure quota, new caribou-range Crown tenure conditions, and Alberta’s transition to the Modernized Royalty Framework.

Jun 30, 2024

Proposed Directive 065 Changes for Disposal and Storage Applications

This article summarizes proposed changes to Directive 065 affecting disposal and storage applications, along with closure-spend and related directive updates.

May 31, 2026

Directive 051 Proposed Changes and Closure Management Updates

This newsletter summarizes proposed changes to Directive 051, updates to closure nomination and liability-management processes, and related AER and Saskatchewan regulatory items.

Jun 30, 2023

Well Testing, Reserves Updates and Brine-Hosted Minerals

This issue covers well testing, reserves reporting, Directive 001 feedback, brine-hosted minerals, Directive 065, licensee capability reporting, and Saskatchewan and BC updates.

Oct 31, 2024

Directive 065, Subsurface Orders and Well File Updates

This issue includes well-file service information, Directive 040 testing reminders, Subsurface Order 2A, new Directive 065 material, Directive 083, Manual 028, OneStop updates, and MRF/geothermal items.

Jul 14, 2024

Special Directive 065 Changes for Disposal, Storage and Carbon Sequestration

This special newsletter focuses on Directive 065 changes related to disposal, storage, induced seismicity, acid gas disposal, sequestration, monitoring, and risk-assessment expectations.

bottom of page