What extra engineering checks matter when a disposal or injection well has sour or critical-sour context?
Category:
Sour Service and Safety Planning
Research Basis
Archive Period
2015-2019
Records Reviewed
6
Primary Topics
critical sour; H2S; casing metallurgy; engineering assessment; ERP; conversion well; re-entry
Current Reference
AER Directive 051; AER Directive 010; AER Directive 087; AER Directive 056; AER Manual 012; AER Directive 071
Common Question
What extra engineering checks matter when a disposal or injection well has sour or critical-sour context?
Archive Findings
The folder includes IRP 1 Critical Sour Drilling, which is broader than D051 but relevant when injection, disposal, conversion, or re-entry work intersects sour service. IRP 1 emphasizes competent technical judgment, engineering assessments, sour-service casing suitability, casing burst/collapse/tension design, hydrogen sulphide degradation mechanisms, and project-plan contents such as geological setting, offset wells, formation pressure, casing design, BOP/choke equipment, drilling fluids, H2S release-rate calculation, ERP, personnel, and wellbore diagram. The 2019 email chain also shows conversion planning where wellbore schematic, packer test, CIL, and pressure limits were active application issues.
Engineering Insight
Need help with an application?
Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays
587.880.2249
Do not let a D051 disposal application become disconnected from sour-service assumptions. Confirm whether sour zones, H2S release potential, sour metallurgy, corrosion risk, and temperature/service conditions affect the casing and completion. For re-entry or conversion wells, verify remaining wall thickness, sour-service grade suitability, packer setting depth, well control exposure during workovers, and emergency planning. Where IRP 1 is used, document any engineering assessment and the qualifications or technical basis behind it.
Current Guidance
Current guidance should be read across Directive 051 for injection/disposal integrity, Directive 010 for casing design, Directive 087 for packer and well-integrity testing, Directive 056/Manual 012 for application requirements, and Directive 071 for emergency preparedness and response. IRP 1 remains an industry recommended practice and does not override regulatory requirements.
Related Regulatory Insights
Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.
Apr 1, 2026
AER Industry Levy, Orphan Fund Levy and Directive 056 Updates
This issue covers AER industry levy and orphan fund levy updates, revisions to Directive 056 and Manual 012 for carbon dioxide and hydrogen pipelines, licence-transfer security-estimator changes, and related royalty-administration items. It is a strong compliance update for operators managing annual cost and licensing obligations.
Feb 1, 2026
AERH2S Model and Site-Specific Risk Assessment Updates
This newsletter highlights the transition to AERH2S for Directive 056 applications, new site-specific risk assessment checklist expectations, and related licensing considerations. It should be used as a well-licensing and H2S resource for operators preparing applications that require release-rate or emergency-planning support.
Jan 1, 2025
Directive 056 and Liability Management Framework Updates
This issue covers liability-management directive updates, Directive 056, Directive 089, Directive 090, Manual 012 changes related to brine, geothermal, and mineral development, and BC disposal-dashboard information. It is a strong well-licensing and emerging-resource update for operators planning new applications.

.png)