Can an older disposal well avoid D051 logging or testing because it predates the guide?

Category:

Compliance and Legacy Wells

Research Basis

Archive Period

1994

Records Reviewed
6
Primary Topics
grandfathering; waivers; legacy disposal wells; monitoring; hydraulic isolation; packer isolation
Current Reference
AER Directive 051; AER Directive 087

Common Question

Can an older disposal well avoid D051 logging or testing because it predates the guide?

Archive Findings

The 1994 workshop discussed how to handle existing sensitive disposal wells that had been approved before the new requirements. The solution was not a blanket exemption. Grandfathered wells could be accepted as meeting qualifying criteria, but new monitoring and testing requirements still applied. The workshop also said waiver decisions should depend on technical merit, mitigation factors, hydraulic isolation, and the ability of monitoring to detect mechanical failures that could affect groundwater.

Engineering Insight
Need help with an application?

Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays

587.880.2249

For a legacy well, separate the question into three parts: initial construction history, evidence available today, and ongoing obligations. If requesting a waiver, state exactly which requirement is being waived and what alternative evidence proves the same risk is controlled. A strong waiver request explains cement and casing history, hydraulic isolation, groundwater protection, packer testing, annular monitoring, and why the remaining risk is acceptable. Avoid arguing only that the well is old or previously approved.

Current Guidance

Current Directive 051 still recognizes grandfathered wells approved before March 1, 1994, but logging waivers must be supported with information identified in section 6. Current monitoring requirements include injectivity and annular pressure monitoring, hydraulic isolation logging where applicable, packer isolation testing as per Directive 087, and well summary/completion schematic requirements.

Related Regulatory Insights

Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.

Jun 1, 2026

Directive 051 Proposed Changes and Closure Management Updates

This newsletter summarizes proposed changes to Directive 051, updates to closure nomination and liability-management processes, and related AER and Saskatchewan regulatory items.

Apr 1, 2023

Municipal Tax Requirements for Licences and Transfers

This newsletter covers unpaid municipal property-tax requirements for well licences and transfers, fee deadlines, pipeline security, OneStop, Directive 067 and Directive 051 items, water regulation, and Saskatchewan and BC updates.

Apr 1, 2021

Drilling Cost Submissions, Directive 087 and OneStop Well Licensing

This newsletter covers drilling and completion cost submissions, Directive 087 well-integrity updates, and the movement of Directive 056 and Manual 012 well-licensing processes into OneStop.

bottom of page