Is gross completion interval reported as measured depth or true vertical depth?
Category:
Drilling and Completion Reporting
Research Basis
Archive Period
2013-2018
Records Reviewed
5
Primary Topics
gross completion interval; measured depth; deviated wells; horizontal wells; DDS reporting
Current Reference
AER Directive 059; AER Manual 027
Common Question
Is gross completion interval reported as measured depth or true vertical depth?
Archive Findings
GCI means Gross Completion Interval completion intervals are measured depth.
Engineering Insight
Need help with an application?
Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays
587.880.2249
Report the interval the way the completion was physically placed in the wellbore. Do not convert to TVD unless the reporting system or current AER guidance specifically asks for it.
Current Guidance
Use current Directive 059 and Manual 027 for well drilling and completion data filing requirements, including completion interval reporting.