top of page

Regulatory Intelligence 

Is gross completion interval reported as measured depth or true vertical depth?

Category:

Drilling and Completion Reporting

Research Basis

Archive Period

2013-2018

Records Reviewed
5
Primary Topics
gross completion interval; measured depth; deviated wells; horizontal wells; DDS reporting
Current Reference
AER Directive 059; AER Manual 027

Common Question

Is gross completion interval reported as measured depth or true vertical depth?

Archive Findings

GCI means Gross Completion Interval completion intervals are measured depth.


Engineering Insight
Need help with an application?

Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays

587.880.2249

Report the interval the way the completion was physically placed in the wellbore. Do not convert to TVD unless the reporting system or current AER guidance specifically asks for it.

Current Guidance

Use current Directive 059 and Manual 027 for well drilling and completion data filing requirements, including completion interval reporting.

Related Regulatory Insights

Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.

Jun 1, 2024

Directive 056, H2S and Pipeline Application Updates

This issue summarizes Directive 056, Manual 012, H2S, Directive 059, EPEA pipeline application conditions, OneStop, Directive 011 liabilities, ST98, and facility life-cycle topics.

Mar 1, 2018

Directive 060, OneStop Drilling Data and Subsurface Orders

This issue covers Directive 060, Directive 059 well drilling and completion data in OneStop, Saskatchewan acid gas disposal, geothermal and CO2 IRIS items, subsurface orders, and LMR/IWCP content.

bottom of page