top of page

Insights

10+ years of regulatory updates, compliance insights, and technical guidance for Western Canadian oil and gas operators.

EXPLORE BY
TOPIC

ChatGPT Image Jun 26, 2026, 12_09_32 PM.png
Disposal Wells
Applications, pressure testing, monitoring and ongoing obligations.
step_rate_testing_mwhip.png
MWHIP
Step rate testing, fracture pressure analysis and maximum wellhead injection pressure determination.
ccus_carbon_capture.png
CCUS
Carbon sequestration tenure, COâ‚‚ storage approvals and long-term containment guidance.
H2S Release Rate
Hâ‚‚S release rate assessments, EPZ calculations and well classification requirements.
h2s.png
EOR
Waterflood, gas injection and enhanced recovery scheme applications and reservoir management.
eor_enhanced_oil_recovery.png
d051.png
D051
Well classification, integrity, logging, testing and injection well compliance requirements.
ChatGPT Image Jul 17, 2026, 01_33_34 PM.png
Off-Target Wells
Well spacing, target areas, off-target penalties and road allowance requirements.

Latest Insights

Stay informed with the latest regulatory updates, bulletins and technical insights.

Jun 29, 2026
D051

Directive 051: Injection and Disposal Wells

Learn about Directive 051 requirements for injection and disposal wells.

Jun 26, 2026
Reservoir Management

Benoit Technical Tools: Declines, Volumetrics and Material Balance

The Declines, Volumetrics and Material Balance tool helps operators forecast production, estimate reserves, and evaluate reservoir performance using practical analysis workflows.

Jun 26, 2026
EOR

Benoit Technical Tools: Voidage Replacement Ratio

The Voidage Replacement Ratio tool helps operators calculate and monitor VRR by pattern or pool to evaluate injection effectiveness and support reservoir management.

From the Benoit Archive

Insights from Decades of Regulatory Experience

Each Regulatory Intelligence Insight uses AI-assisted analysis to identify practical lessons from historical regulatory records, connecting those lessons to current regulatory guidance.

RI-011

Does non-routine abandonment work require approval before field work begins?

Yes. Historical records indicate that non-routine abandonment operations required regulator approval before the work was started.

RI-012

If a well has pressure after abandonment work, is it considered abandoned?

Not necessarily. Historical correspondence indicates that pressure after abandonment work may point to a failed plug, leaking cement plug, or casing issue that must be addressed before cut and cap.

RI-013

When can zonal abandonment be treated as routine instead of non-routine?

Historical records indicate that zonal abandonment may be routine where the isolation method satisfies the required coverage across the interval; otherwise additional cement, a bridge plug, or non-routine approval may be required.

bottom of page