top of page
From the Archive:

Is well classification determined solely by gas-oil ratio (GOR)?

Can a gas well produce oil and still remain classified as a gas well?

Can historical well classifications be evaluated using today's rules?

What is one of the most common misconceptions about well classification?

How to Reactivate a Well in OneStop

Well Licensing

Jun 23, 2022

Overview

Reactivating a suspended well in AER OneStop requires more than changing the licence status. Before a well can be returned to active service, operators should ensure the applicable inspection, servicing, testing, and reporting requirements have been completed. A complete and accurate submission helps minimize regulatory delays and demonstrates compliance with Alberta Energy Regulator (AER) requirements.

This guide provides an overview of the OneStop reactivation workflow and highlights the information typically required before submitting a well licence reactivation.

When This Process Applies

This process applies when a suspended well is being returned to active status. Before beginning the OneStop submission, operators should confirm that the well has met the applicable reactivation requirements under AER Directive 013, including any required inspections, servicing, and pressure testing.

Having the necessary information prepared before starting the application will make the submission process more efficient and reduce the likelihood of validation errors.

OneStop Reactivation Process

After logging into OneStop, navigate to Operate → Reporting → Well Suspension → Reactivation.

Search for the appropriate well licence and verify that the correct licence has been selected before proceeding. Once selected, enter the required applicant contact information, including the contact name, company details, phone number, email address, and other requested information.

The reactivation screen will display the information required to complete the submission. Depending on the well and its risk classification, operators may be required to enter pressure test information for the wellhead, casing, and tubing. The application records the test dates along with whether each test passed or failed.

Before submitting the application, carefully review all entered information to ensure it is complete and accurate. Use the Validate function to identify any missing information or data issues. Once validation is successful, save the application and submit it through OneStop.

Following submission, the updated well status may not appear immediately. Operators should allow time for the system to process the application and confirm the submission has been accepted.

Key Considerations

Before submitting a reactivation, verify that all required field work has been completed and documented. Pressure testing requirements may vary depending on the well's risk classification and the length of time the well has been suspended. Operators should ensure that all supporting records are available and that the information entered into OneStop matches the underlying field documentation.

It is also important to confirm that the correct well licence has been selected and that applicant contact information is current. Small data entry errors can result in unnecessary delays or requests for clarification from the regulator.

Need Assistance?

Benoit Regulatory assists operators with well licensing, OneStop submissions, suspended well compliance, and regulatory reporting. If you require assistance preparing a well reactivation application or determining the applicable AER requirements, our team can help ensure your submission is complete, accurate, and submitted efficiently.

Learn More:
Need Assistance?
ChatGPT Image Jul 11, 2026, 04_05_45 PM (1).png
ChatGPT Image Jul 11, 2026, 04_05_46 PM (4).png
ChatGPT Image Jul 11, 2026, 04_05_45 PM (2).png
ChatGPT Image Jul 11, 2026, 04_05_45 PM (3).png
Need help with an application?

Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays

587.880.2249

Related Insights

26-08-31
D051

Directive 051 Finalized, Closure Quota and 2027 Royalty Updates

This September update covers finalized Directive 051 disposal-well requirements, practical Directive 020 abandonment changes, the 2027 closure quota, new caribou-range Crown tenure conditions, and Alberta’s transition to the Modernized Royalty Framework.

26-07-14
AER Updates

Revenue Payment Changes, Inspection Manual Rescissions and Directive 077 Updates

This July 2026 newsletter covers upcoming Alberta Energy and Minerals revenue-payment changes, the AER rescission of inspection Manuals 001, 002, and 005, and updates to Directive 077 pipeline testing and operating requirements. It is a useful compliance update for operators managing payments, inspection obligations, and pipeline activities.

26-06-28
EOR

Enhanced Oil Recovery

An introduction to enhanced oil recovery approvals, planning and regulatory requirements.

bottom of page