Regulatory Intelligence
Can the ESA be attached without summarizing each borehole?
Category:
Application Completeness
Research Basis
Archive Period
2015-2023
Records Reviewed
10
Primary Topics
ESA; borehole assessment; soil data; site-specific information; application checklist
Current Reference
AER Directive 058; AER Manual 034
Common Question
Can the ESA be attached without summarizing each borehole?
Archive Findings
No.Historical records indicate that a soil assessment for each borehole is required, as described in Part 3 of the New Oilfield Waste Management Application Requirements checklist.
.png)
Need help with an application?
Our team can help you navigate regulatory requirements, prepare strong applications and avoid costly delays
587.880.2249
Engineering Insight
Put the key borehole and soil data in the application body or tables. Do not assume a large ESA attachment will satisfy the review if the checklist asks for summarized site-specific information.
Current Guidance
Use Directive 058 and Manual 034 application requirements. Include site-specific environmental and groundwater information required for the proposed activity.
Related Regulatory Insights
Historical newsletter insights that reference the same directive, manual, rule or regulatory requirement.
